Identify who loses access and when
A renovation may leave tenants, staff or a household on the property while plumbing is unavailable. Plan temporary facilities around that interruption, not only the contractor’s overall finish date.
Ask which bathrooms remain usable, who may enter them and whether access ends outside building hours. A crew using one restroom and residents using another may have different needs. Include washing and any accessibility requirement in the same discussion.
Separate the resident route from the work route
Review a usable path that does not send people through demolition, stored materials or vehicle unloading. The delivery entrance may differ from the normal front door. Provide the property manager’s instructions and discuss an alternative location if the first position cannot be accepted.
Close the gap before closing the rental
Check that indoor facilities are actually restored before requesting collection. If the work changes, ask about extending the hire and updating the service plan. Do not assume a contractor’s revised completion date automatically changes the equipment order.